Monday, June 9, 2008
Chapter 4 complete
Thursday, May 29, 2008
Firewall
And a detail of the alum. inserts:
For the 14 blind screws, I drilled the holes after glassing one side and cut a countersink:
I did diverge slightly from the plans after reading about problems of having the screws turn later on. After looking at either cutting a cross shape into the screw head or installing piano type wire inlaid into the screw head and birch, I decided on the cross shape.
Here's what it looked like:
F-22/Doubler
F-22 with doubler installed:
Glassed and waiting for cure:
Here's a close-up of where F-22 and the doubler meet:
And finally, F-22/doubler completed. I've been sanding off the excess fiberglass and I'm afraid that it is all over the bulkhead here. No, my bulkhead is not full of air pockets!
Thursday, May 1, 2008
Aft Gear Attach Bulkhead
And glassed:
I'll try and do better about keeping my blog updated in a more timely fashion. On the plus side, I've started a new 7 days on - 7 days off shift which should allow me more time to work on the aircraft. On the minus side, I've started studying for my dispatcher license and that will take up a good deal of my time in the near future. Minus being that I'll have less time to work on the aircraft, getting my dispatch license is definitely a good thing overall. Just have F-22 and the firewall left in chapter 4. Hope to complete that next off week (I start my on week tonight) and get things prepped for Ch.5.
Forward Gear Attach Bulkhead & F-28
Here are F-28 and the upper portion of the forward GAB and F-28 ready for glassing:
The upper and lower sections will be joined later. Upper portion of the forward GAB completed:
The lower section of the forward GAB ready for glassing:
And completed:
F-28 completed:
IP Complete
All stiffeners in place w/ micro along the edges:
For the electrical conduits I would glass first the single ply on the upper surface, allow it to cure, and then do the 2 plies for the conduit itself as shown below:
Finally, the IP completed:
Thursday, March 27, 2008
Instrument Panel
Gear Attach Bulkhead Hardpoints
Thursday, March 13, 2008
Aft & Forward Landing Gear Attach Bulkheads
Everything laid out and ready for cutting:
And everything cut out:
F-22
Cut and ready to by 5-min epoxied together:
5-min epoxied and weighted down:
And finally, all put together and ready for glassing:
Tuesday, March 11, 2008
Instrument Panel
Thursday, March 6, 2008
Thursday, February 28, 2008
Front Seatback Bulkhead Finished
Detail of floxed corner:
And the finished piece (now in the garage after cure and knife trim):
Next will be bulkheads F-22 and F-28. Before I can start on those I have a lot of drawing tracing to be done. I found that setting up my first seatback bulkhead (yeah, guess I forgot to mention that - it didn't go well, but after doing some more online research I've found where I went wrong. Aircraft Spruce, in their wisdom, supplies you with two pieces of the 3/4" foam used in this step. In my research I saw that others had benefited from that as well so I didn't feel too bad.) set up on a card table with a bright light works very well for my drawing tracings.
Tuesday, February 26, 2008
Beginning Chapter 4
The instructions say that you might have to glue two pieces of foam together because of the size, but Aircraft Spruce supplies pieces of foam large enough that you don't have to do any gluing. After cutting the foam to the right dimensions, I cut a 45° angle along the top of the bulkhead as it will be installed at a 45° in the fuselage.
I also went ahead and trimmed the the top cutouts although the plans say to do this step after glassing the first side. After reading problems that other builders encountered when trying to cut these after glassing I went ahead and precut these. I decided to wait until actually fitting the bulkhead in the fuselage before making the other cuts though as many suggested that this might make life easier in chapter six. We'll see how I feel when trying to cut the bulkhead then.
Detail of front seatback top front cuts:
After cutting the piece I cut the bid. fiberglass to be used in glassing the front side. The bid. has to be cut and put on at a 45° angle. The problem is that the fiberglass roll isn't wide enough to cover the piece with one section so you have to use a small triangle to finish each of the two plies used. I must admit that I'm not 100% comfortable with butting up the edges of the fiberglass, but that is the method prescribed in the plans for use with bid. fiberglass. Uni fiberglass has an overlap of 1" when putting two pieces together, and I must admit that I was tempted to overlap the bid. but followed the plans and simply butted the two pieces together.
Here's a pic of the fiberglass cut out over the piece before starting glassing:
I hope to finish out the seatback bulkhead tonight (or tomorrow a.m.) if it stays warm enough.
Oh, and just because I like my speedometer-like thermometer: